PROJECT · VEGHEL · NEW CONSTRUCTION
Passenger lift for new office building in Veghel
In Quadira's new office building in Veghel, Hublift has installed a 1,000 kg passenger lift with 3 stops in the concrete lift shaft. The building was constructed by Timbor. The lift is fully approved by the Liftinstituut.

Lifting capacity
1,000 kg
Stops
3
Location
Veghel
Inspection
Liftinstituut
01 · IN BRIEF
Project at a glance
What was built, where, and why, all in one place.
Client
Quadira, new office building in Veghel, built by Timbor.
Type of lift
Passenger lift of 1,000 kg, suitable for a maximum of 13 people.
Shaft
Concrete lift shaft in the new building.
Stops
3 stops: all floors of the office are accessible.
Finish
Black shaft doors and black portal, light cabin with stainless steel control panel and mirror.
Result
Fully approved by the Liftinstituut.
02 · THE CHALLENGE
Three floors, accessible to everyone
The office has three floors and needed to be easily accessible on every floor for employees and visitors, including people with a wheelchair or stroller. The passenger lift also had to match the sleek, modern interior of the building.
Client requirements
- Every floor accessible for employees and visitors
- Accessible with wheelchair or stroller
- A lift that matches the modern interior
- Installation in the concrete lift shaft of the new building
03 · THE SOLUTION
A 1,000 kg passenger lift, sleekly finished
We installed a passenger lift with a lifting capacity of 1,000 kg serving three floors. The shaft doors and the portal are finished in black, which blends beautifully with the warm grey tones and the industrial ceiling of the office. The cabin has a light finish, with a full-height stainless steel control panel, a mirror, a handrail, and LED lighting. After installation, the Liftinstituut fully inspected and approved the lift.

1,000 kg
Lifting capacity
Suitable for a maximum of 13 people.
3
Stops
All floors of the office accessible.
Black
Shaft doors and portal
Matches the grey tones of the interior.
Stainless steel
Control panel
Full height of the cabin.
Mirror
Light cabin
With handrail and LED lighting.
Liftinstituut
Inspection
Fully inspected and approved.

04 · INSTALLATION AND INSPECTION
Installed in the concrete shaft, approved by the Liftinstituut
The passenger lift was installed in the concrete lift shaft of the new office building that Timbor built for Quadira. After installation, the Liftinstituut fully inspected and approved the lift, so it could be put into use immediately.
01 · Measuring the shaft
02 · Installation in the shaft
03 · Finishing and adjustment
04 · Liftinstituut inspection
05 · PROJECT PHOTOS
The passenger lift in the office

Light cabin
Full-height stainless steel control panel, mirror, handrail, and LED lighting.

Black lift doors
Sleekly integrated under the industrial ceiling of the office.

Accessible on every floor
Employees and visitors can reach all three floors.

Black portal
The portal around the lift door matches the interior.
06 · THE RESULT
An accessible and modern office building
Quadira now has an office building where every floor is easily accessible for employees and visitors. The passenger lift is approved by the Liftinstituut and its appearance matches the sleek interior of the building.
Read more
A passenger lift for your office or business premises?
Contact us for personal advice, from the initial consultation through to installation.
Hublift B.V.
Beukelszweg 2
5466 AT Veghel
0413 340 270
[email protected]